EightQueensAndPuzzle

(★ 9)

Generate a large number of 8-puzzle and 8-queens instances and solve them by hill climbing (steepest-ascent and first-choice variants), hill climbing with random restart, and simulated annealing. Measure the search cost and percentage of solved problems and graph these against the optimal solution cost.

EightQueensAndPuzzle 최신버젼 다운로드

최종 버전 다운로드 (.zip)
// repository documentation